Analisa Pemeliharaan Mesin Printer Dengan Reliability Centred Maintenance (RCM) II Dan Life Cycle Cost (LCC) Di CV. XYZ
DOI:
https://doi.org/10.55606/juitik.v3i2.509Keywords:
Reliability Centered Maintenance (RCMII), Life Cycle Cost (LCC), maintenanceAbstract
This study aims to optimize the maintenance of Banner printing machines at CV. XYZ Printing Company using the Reliability Centered Maintenance II (RCM II) and Life Cycle Cost (LCC) methods. RCM II is employed to identify and evaluate component failures, while LCC is utilized to calculate Costs throughout the machine's lifecycle. The study determines maintenance intervals for each component of the Banner printing machines. Subsequently, the Life Cycle Cost (LCC) is calculated to compare the maintenance Costs before and after implementing RCM II and LCC methods. The results reveal that the total Cost of maintenance after implementing RCM II and LCC is Rp. 258,424,522, which is lower than the previous total maintenance Cost of Rp. 300,000,000. Thus, the application of RCM II and LCC methods effectively optimizes the maintenance of Banner printing machines in a Cost-efficient manner. This research contributes to enhancing the effectiveness and efficiency of maintenance in the Banner printing industry.
References
Alting, L., & Jensen, H. V. (2011). Life Cycle Costing: Theory and practice. Springer Science & Business Media.
Erwin N. (2017). “Penerapan Metode Reliability Centered Maintenance Menggunakan Software SPSS Pada Sistem Pendingin Generator Mitsubishi Kapasitas 62500 kVA (Studi Kasus Di PT. Toba Pulp Lestari, Tbk)”. Fakultas Teknik, Universitas Sumatera Utara, Medan.
Fani W. R. (2016). “Implementasi Reliability Centered Maintenance (RCM) Pada Proses Gas Kriogenik”. Fakultas Teknologi Industri, Institut Teknologi Sepuluh Nopember, Surabaya.
Heizer, J., & Render, B. (2017). “Operations management. Pearson Education Limited”. London : Pearson Education Limited.
Moubray, J. (1997). “Reliability-Centered Maintenance”. Butterworth: Heinemann
Nowlan, F. S., & Heap, H. F. (1978). “Reliability-Centered Maintenance”. Aviation Week & Space Technology, 109(18), 40-43.
Park, S. C., & Kim, J. T. (2014). Life Cycle Cost analysis for building systems: A review. Renewable and Sustainable Energy Reviews, 35, 1-8
Pasaribu, M. I. et al. (2021). “Analisis Perawatan (Maintenance) Mesin Screw Press Di Pabrik Kelapa Sawit Dengan Metode Failure Mode and Effect Analysis (FMEA) Di PT. XYZ”. JITEKH, Vol. 9, No. 2, Tahun 2021, 104-110
Pranowo, I, D. (2019). “Sistem Manajemen Pemeliharaan”. Yogyakarta : Penerbit Deepublish
Rahaja, I.P, et al. (2021). “ANALISIS SISTEM PERAWATAN MESIN BUBUT MENGGUNAKAN METODE RCM (RELIABILITY CENTERED MAINTENANCE) DI CV. JAYA PERKASA TEKNIK”. Industri Inovatif - Jurnal Teknik Industri ITN Malang. E-ISSN: 2615 - 3866
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Jurnal Ilmiah Teknik Informatika dan Komunikasi
This work is licensed under a Creative Commons Attribution-NoDerivatives 4.0 International License.