Sistem Informasi Monitoring Proyek Konstruksi CV Hasanah Beton Indonesia dengan Metode Earned Value Management

Authors

  • Rizal Naufal Farras Arkanda Universitas Muria Kudus
  • Pratomo Setiaji Universitas Muria Kudus
  • Wiwit Agus Triyanto Universitas Muria Kudus

DOI:

https://doi.org/10.55606/juisik.v5i3.1779

Keywords:

Construction, CV Hasanah Beton Indonesia, Earned Value Management, Project Monitoring, Information System

Abstract

The construction project monitoring process at CV Hasanah Beton Indonesia often presents various obstacles, such as late reporting, inaccurate data, and low efficiency in project supervision and control. These conditions make it difficult to accurately detect cost and time deviations. Our research aims to develop a web-based construction project monitoring system by applying the Earned Value Management method at CV Hasanah Beton Indonesia. The system was developed using the Laravel framework and MySQL database, with a Waterfall development model that includes the stages of requirements analysis, design, implementation, testing, and maintenance. The system design was carried out using FOD and Use Case Diagrams to illustrate the interaction between users and the system. System testing was conducted using the Black Box method to ensure all functions run according to the test scenario. Our findings show that the system is able to display performance indicators such as the Schedule Performance Index and Cost Performance Index in real-time, thereby helping to accurately detect cost and time deviations. Overall, this system improves the efficiency of the reporting process, the accuracy of project performance evaluation, and provides support for faster, more measurable, and data-driven managerial decision-making at CV Hasanah Beton Indonesia.

References

Amri, M. F., & Harahap, C. A. (2024). Rancang bangun sistem informasi manajemen proyek pada CV Graha Raya Consultant. J-ENSISTEC (Journal of Engineering and Sustainable Technology), 11(1), 10152-10159. https://doi.org/10.31949/jensitec.v11i01.11847

Andrian, R. D., Sharipuddin, & Devitra, J. (2025). Analisis dan perancangan sistem informasi manajemen proyek pada CV Naila Fathiyah Farah. Jurnal Informatika dan Rekayasa Komputer (JAKAKOM), 5(1), 1255-1263. https://doi.org/10.33998/jakakom.v5i1

Farhan, F. A., Setiawan, R. R., & Irawan, Y. (2025). Sistem informasi pengelolaan persediaan berbasis safety stock pada industri konveksi seragam polisi. Edumatic: Jurnal Pendidikan Informatika, 9(2), 599-608. https://doi.org/10.29408/edumatic.v9i2.31248

Febrianti, N., Yusuf, F., & Musdar, I. A. (2025). Sistem informasi persediaan stok benih tanaman menggunakan teknologi barcode dalam studi kasus Kantor BPTH Wilayah II. Jurnal Ilmiah Sistem Informasi dan Ilmu Komputer, 5(2), 33-48. https://doi.org/10.55606/juisik.v5i3.1516

Firdausi, A. A., Ristanto, I., & Burhanudin, F. (2025). Pengembangan model prediksi kinerja proyek menggunakan earned value management berbasis data progres mingguan (Studi kasus pembangunan gedung LPPM & BPMI Univet Bantara). Sultra Civil Engineering Journal (SCiEJ), 6(2), 650-662.

Gumanti, M., Muslihudin, M., Mukodimah, S., & Adab, P. (2024). Manajemen proyek sistem informasi. Penerbit Adab.

Hadinagoro, R. I. R., Gumilar, A. C., Ramdani, A., & Nasrulloh, L. (2025). Evaluasi kinerja pelaksanaan konstruksi proyek pembangunan dan penataan infrastruktur di lingkungan Badan Geologi Iraq: Wawasan hambatan dan tantangan penerapan EVM pada proyek. Jurnal Impresi Indonesia, 4(9), 3319-3333. https://doi.org/10.58344/jii.v4i9.6891

Kirana, D. M., Riyadi, A. A., & Susanto, A. (2025). Sistem informasi kepegawaian dan penggajian karyawan berbasis web dengan fitur selfie dan pemantauan lokasi. Edumatic: Jurnal Pendidikan Informatika, 9(1), 304-313. https://doi.org/10.29408/edumatic.v9i1.29662

Mandagi, F. M. (2022). Studi sumber daya manusia pada proyek jasa konsultan terhadap kualitas pekerjaan proyek di Kabupaten Minahasa. Jurnal Tekno, 20, 82.

Masgode, M. B., Hidayat, A., Laksmi, I. A. C. V., Triatmika, I. N. A., Puspayana, I. P. A. I., Iskandar, A. A., … & others. (2024). Dinamika industri konstruksi di Indonesia. Tohar Media.

Muharni, S. (2021). Analisa dan perancangan sistem informasi (Edisi pertama). Bintang Pustaka Madani.

Mulya, F., Fauziyah, & Sharyanto. (2022). Sistem informasi monitoring proyek dalam bidang konstruksi gedung berbasis web pada PT Masgo Muriyo Jaya Fany. Jurnal Sistem Informasi dan Manajemen, 10(2), 223-226.

Naufal, A., Pramono, D., & Prakoso, B. S. (2022). Pengembangan sistem informasi monitoring dan helpdesk proyek pengembangan perangkat lunak (Studi kasus: PT Lua Kreatif Teknologi). Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer, 6(4), 1558-1567.

Nurlisa, U. (2021). Sistem informasi monitoring proyek Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Kuantan Singingi. Jurnal Perencanaan, Sains, Teknologi, dan Komputer (JuPerSaTeK), 4(2), 1247-1261.

Prasetio, R. A., & Cuhenda, C. (2025). Perancangan sistem monitoring dan evaluasi proyek berbasis Laravel untuk optimalisasi manajemen proyek PT Inkaba (Perseroda). Jurnal Informatika dan Teknologi Pendidikan, 5(1), 44-53. https://doi.org/10.59395/jitp.v5i1.126

Prehanto, D. R. (2020). Buku ajar konsep sistem informasi (I. K. D. Nuryana, Ed.). Scopindo Media Pustaka.

Purnomo, D. A., & Prisilia, H. (2024). Analisis biaya dengan menggunakan EVM pada proyek konstruksi: Studi kasus proyek rehabilitasi Mall Pelayanan Publik Kabupaten Banyuwangi. Jurnal Tecnoscienza. https://doi.org/10.51158/tecnoscienza.v8i2.1142

Putri, M. P., & Bobby. (2020). Sistem informasi manajemen proyek PT Samudera Perkasa Konstruksi berbasis web. Matrik: Jurnal Manajemen, Teknik Informatika dan Rekayasa Komputer, 20(1). https://doi.org/10.30812/matrik.v20i1.716

Rofi'ah, S., & Lutfi, A. (2024). Sistem informasi monitoring pembangunan proyek di Dinas Pekerjaan Umum Cipta Karya Perumahan dan Permukiman Bayuwangi berbasis web. JAMASTIKA, 3(1). https://doi.org/10.35473/jamastika.v3i1.3047

Rompas, L. M. (2023). Aplikasi sistem informasi manajemen proyek (Studi kasus: Perencanaan ruas jalan CV Brysel Jaya Abadi). Jurnal Tekno, 21(85).

Sanjaya, A., Julianti, M. R., & Panchadria, P. A. (2022). Sistem informasi monitoring proyek pada PT Lawave Kreasi Indonesia. Jurnal Teknologi, Pendidikan dan Manajemen Global, 1(1).

Sunarya, M. H., Irwansyah, R., & Pebriadi, M. S. (2021). Sistem informasi monitoring dan evaluasi proyek dengan menerapkan perhitungan deviasi. Jurnal JTIK (Jurnal Teknologi Informasi dan Komunikasi), 5(2). https://doi.org/10.35870/jtik.v4i2.146

Waseso, B., Meri, M., Tanto, T., Saputra, P. Y., Mahatma, K., Andriyani, S., Widiyanto, W. W., Riza, F., & Dristyan, F. (2025). Manajemen proyek perangkat lunak. Faaslib Serambi Media.

Downloads

Published

2025-12-02

How to Cite

Rizal Naufal Farras Arkanda, Pratomo Setiaji, & Wiwit Agus Triyanto. (2025). Sistem Informasi Monitoring Proyek Konstruksi CV Hasanah Beton Indonesia dengan Metode Earned Value Management. Jurnal Ilmiah Sistem Informasi Dan Ilmu Komputer, 5(3), 606–619. https://doi.org/10.55606/juisik.v5i3.1779

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.